3 Plastering

Plastering

Chiseling the Concrete, Laying Water-proof Sheet and Plastering

After connecting all electricity, water supply, gas pipe, broadband and air condition system the plasterer will start working. In addition to leveling the floor and walls, and waterproofing, laying bricks is also the work of a plasterer. Depending on the stock of tiles, you may need to order tiles two to three weeks in advance, usually while the demolition works are in progress. The bathtub needs to be installed with plastering work, so it is also necessary to purchase it in advance and reserve time for delivery.

The Arts of Plastering

Our Experience Masters

Experienced Masters

See Our Perfect Works

Do you know the correct bathroom waterproof layer? I believe everyone knows that the toilet is the most exposed place in the house. If the construction of the waterproof layer is not done well, there will be leakage. They will cause mildew on the walls and floors of the home, and more seriously, the steel bars will rust and the concrete will peel off. If it leaks to the lower level, compensation will be required if they are you neighbour. The problem cannot be ignored. . And waterproofing is not just as simple as sticking a few tiles, but also needs to do the professional waterproofing work.

Chisel Floor And Wall
Waterproofing
Laying Tiles

Home decoration waterproofing is an essential part. If waterproofing is not done well, it will be a huge trouble for future life. It will only affect the relationship between upstairs and downstairs neighbors, and it may cause legal conflicts. In recent years, house owner has paid more and more attention to the waterproof construction process and construction materials.

Dedicated Master
Professional Services
Certified Technician

Remember to do a test after the project! After the project is completed, the shower space should be tested for water accumulation. Water should be continuously sprayed on the wall for 5 minutes, and then the wall on the other side should be checked for water seepage and moisture; and the leak-proof test should be performed on the tank position, and the door and the bottom should be sealed. The water outlet should be filled with water to a certain height on the toilet floor and marked. If there is no significant drop within 8 to 24 hours, the waterproofing is qualified.

Plastering makes the wall more and stronger and gives it a more shiny and robust look in any drywall. The reaction which takes place in the process is very important to strengthen the bond and make walls stronger. It helps to create a smooth surface to apply paint on it. Painting helps to make the wall look better.

Do you need to plaster walls before painting?

Allow all bare or new plaster to dry completely before decorating. You'll know it's dry when any dark patches shrink away, or it turns a light pink/grey colour. Walls that have already been painted are fairly easy to prepare for new paint, but it's worth doing a few things first to help get that professional finish.

Plastering creates a durable and robust finish to existing drywall. A chemical reaction occurs when water escapes from the cement mixture. This reaction strengthens the bond, which is responsible for making the plastered walls stronger. Plastering creates an even surface for the application of paints.

Bathrooms are the main wet area in the house. Therefore, you need to waterproof the area so that water does not get into the substructure of the house and cause major structural damage. Waterproofing is typically done by experts while the bathroom is being built.

f you are concerned about the tile grouting that could be penetrated by water when using the shower, then it is important to install a waterproof membrane. This material will act as protection and water will be diverted toward the drain which could also prevent the formation of mold.

Need Any Help?

Quick Contact

    Download a Company Brochure